RD-TIW
2025-08-21 17:44:46
0

Reduce Rig Time

Drilling and Completion are Independent Between the Wells

Commitment to the Second(or the Third) Well is Not Necessary After Spudding the First Well

Each Well Can Be Maintained Independently

Enhanced Safety

Reduced Number of Bop Connections

Hign Speed Assembly, Slip-lock Connectors are Available

Reduced Inventory

Modular Design, Interchangeable Components

上一篇:RD-DTT

下一篇:RD-J/YG

相关内容

热门资讯

RD-T Bottom and Top Prep: API Thread, Premium ThreadBod...
RD-C Bottom Prep: API or Premium Thread, Slip-on Weld, ...
RD-IW Reduce rig timeEnhanced safetyReduced number of BO...
RD-CP Cost EffectiveMinimal Field MaintenanceEasy Bean R...
RD-S Full-Bore DesignMetal Seal FeaturesSpecialized Sur...
RD-CA Increased Safety: Design to Handle High Pressure a...
RD-J/YG Choke and Kill Manifolds are Important Well Contro...
RD-DTT Block Valve Body Adopts Integral Design, Compact S...
RD-B Floating Ball Valve Has Compact Structure, and Sea...
RD-TIW Reduce Rig TimeDrilling and Completion are Indepen...