Reduce Rig Time
Drilling and Completion are Independent Between the Wells
Commitment to the Second(or the Third) Well is Not Necessary After Spudding the First Well
Each Well Can Be Maintained Independently
Enhanced Safety
Reduced Number of Bop Connections
Hign Speed Assembly, Slip-lock Connectors are Available
Reduced Inventory
Modular Design, Interchangeable Components